
BIM and clash detection go hand in hand as clash detection is an integral part of BIM as it helps to identifies where the independent models clash with each other- finding where elements from one model overlap the elements of models from other architect-engineering design disciplines ensuring every aspect works hand-in-hand and nothing is incompatible.
Clashes and interference can lead to reworks, material and manpower waste and schedule overruns, is poor interdisciplinary coordination during the construction stage and even lead to a total design failure in terms of compliance.
At A2plus, we follow enhanced BIM coordination process spearheaded by BIM engineers with proficiency in Autodesk Navisworks™ through which we carry out constructability reviews, clash detection and generation of clash reports & conducting coordination meetings with our stakeholders.

